Goal Programming Model For Production Planning In A Toothpaste Factory
Subscribe to read and download this work.
ABSTRACT
The GP model was developed for production planning in a toothpaste factory. Two objectives were distinguished: minimization of processing cost, and maximization of the capacity utilization of production facilities. Two priority structures were used to explore the trade-off options. When processing cost minimization was assigned the first priority, the utilizations of Processing Plant 1 and Filling Machine 2 were 20.32% and 0.18% respectively. When capacity utilization was assigned first priority, the processing cost increased by 7.55% but capacity utilization improved. The least utilized facility was Filling Machine 1 with a utilization of 43.85%.
Reviews
No reviews yet.
APA
(2026). Goal Programming Model For Production Planning In A Toothpaste Factory. Afribary. Retrieved June 14, 2026, from http://library.afribary.com/works/goal-programming-model-for-production-planning-in-a-toothpaste-factory
MLA
"Goal Programming Model For Production Planning In A Toothpaste Factory." Afribary, 6 Jun. 2026, http://library.afribary.com/works/goal-programming-model-for-production-planning-in-a-toothpaste-factory. Accessed June 14, 2026.
Chicago
"Goal Programming Model For Production Planning In A Toothpaste Factory." Afribary (2026). Accessed June 14, 2026. http://library.afribary.com/works/goal-programming-model-for-production-planning-in-a-toothpaste-factory