DESIGN AND IMPLEMENTATION OF PRODUCTION CONTROL SYSTEM (A CASE STUDY OF 7UP BOTTLING COMPANY)
Subscribe to read and download this work.
ABSTRACTThis project will be centered on the production control system. This production control system being operated manually ad due to the numerous problem encountered and over payment. A design was taken to computerized in order to check this problem the problem were identified after series of interviews and examination of document after which analysis will be made and a computerized procedure recommended. This project will also suggest how to successfully implement the computerized procedure and to overcome the obstacle that would hinder the successful implementation of the system. The new system was developed using visual basic 6.0 and access database. This language was chosen because of its easy syntax and features for developing windows based applications.
TABLE OF CONTENTS Title page Certification page Dedication Acknowledgment Approval page Table of contents Abstract
CHAPTER ONE Production control system of study 1.0Historical background 1.1Aims and objective 1.2Scopes of study 1.3Limitation of the study 1.4Significance of the study 1.5Definition of terms
CHAPTER TWO REVIEW OF RELATED LITERATURE 2.0Introduction 2.1Basic control procedure 2.2Problem of control
CHAPTER THREE SYSTEM INVESTIGATION AND SYSTEM ANALYSIS 3.0Introduction 3.1Description of the existing system 3.1.2Materials for the production 3.2Monitoring and control terms 3.3Method of data collection 3.3The structure of the existing firm 3.4The objective of the existing of system 3.5The input and output format
CHAPTER FOUR DESIGN, DEVELOPMENT AND IMPLEMENTATION 4.0Introduction 4.1Output specification 4. 1Data base life design and specification 4.2Input specification 4.3System flowchart 4.4Program design 4.5Program flowchart 4.6Program code 4.7System requirement 4.8System implementation 4.9Program documentation
CHAPTER FIVE SUMMARY, CONCLUSION AND RECOMMENDATION 5.1Summary 5.2Conclusion 5.3Recommendation References
Reviews
No reviews yet.
APA
AYODEJI, A. (2026). DESIGN AND IMPLEMENTATION OF PRODUCTION CONTROL SYSTEM (A CASE STUDY OF 7UP BOTTLING COMPANY). Afribary. Retrieved June 15, 2026, from http://library.afribary.com/works/design-and-implementation-of-production-control-system-a-case-study-of-7up-bottling-company
MLA
AYODEJI, AKINADE. "DESIGN AND IMPLEMENTATION OF PRODUCTION CONTROL SYSTEM (A CASE STUDY OF 7UP BOTTLING COMPANY)." Afribary, 6 Jun. 2026, http://library.afribary.com/works/design-and-implementation-of-production-control-system-a-case-study-of-7up-bottling-company. Accessed June 15, 2026.
Chicago
AYODEJI, AKINADE. "DESIGN AND IMPLEMENTATION OF PRODUCTION CONTROL SYSTEM (A CASE STUDY OF 7UP BOTTLING COMPANY)." Afribary (2026). Accessed June 15, 2026. http://library.afribary.com/works/design-and-implementation-of-production-control-system-a-case-study-of-7up-bottling-company