DESIGN AND IMPLEMENTATION OF COMPUTERIZED FRONT MANAGEMENT INFORMATION SYSTEM (HOTEL)
Subscribe to read and download this work.
This study led to the development of “Hotel- Mis package” which will help a long way in reducing the problem encountered by the Entire management and staff of the hotel. The power of the package is also see in the area where time is of great importance. This package will help immensely in eliminating wasted time in the operation of the hotel service there by enhancing effective customer services.
ORGANIZATION OF THE WORK Chapter one of this project explains what the project is all about. It deal with the aims and objective of the project the statement of the problems, the importance of the study, limitations of the study and other information are included in this chapter.
Chapter two detail fully the literature review of this project it gives adequate information on hotel and its activities. More light is shed on the project.
Chapter three highlights the existing system and it objectivities. The input, process and output analysis is also highlighted. The problem of the existing system is also mentioned in this chapter.
Chapter four details the design of the new system the necessary software and hardware requirement for implements of new system are mentioned here. The input and output specification and their design file system are show system and program flow chart are drawn here.
Chapter five, program is written and tested and was found suitable for the new system.
Chapter six deals with the documentation. Chapter seven details the outcome of the study. The project id recommended to various filed.
TABLE OF CONTENT Cover page Title page Certification Dedication Acknowledgement Abstract Organization of the work Table of contents
CHAPTER ONE INTRODUCTION 1.1 Statement of the problem 1.2 Purpose of the study 1.3 Aims and objectives 1.4 Scope or delimitation 1.5 Limitation 1.6 Assumption 1.7 Definition of terms
CHAPTER TWO: Literature Review
CHAPTER THREE: Description And Analysis 3.1 Fact finding method used 3.2 Objective of the existing system 3.3 Input, process, output analysis 3.4 Information flow diagram 3.5 Problems of the existing system 3.6 Justification for the new system
CHAPTER FOUR: Design of the new system 4.1 Output specification and design 4.2 Input specification and design 4.3 File design 4.4 System flow chart 4.5 Procedure chart 4.6 System requirement
CHAPTER FIVE IMPLEMENTATION 5.1 Program design 5.2 Program flowchart 5.3 Source program 5.4 Test run
CHAPTER SIX DOCUMENTATION
CHAPTER SEVEN RECOMMENDATION AND CONCLUSION 7.1 References
Reviews
No reviews yet.
APA
Research, A. (2026). DESIGN AND IMPLEMENTATION OF COMPUTERIZED FRONT MANAGEMENT INFORMATION SYSTEM (HOTEL). Afribary. Retrieved June 15, 2026, from http://library.afribary.com/works/design-and-implementation-of-computerized-front-management-information-system-hotel
MLA
Research, Afri. "DESIGN AND IMPLEMENTATION OF COMPUTERIZED FRONT MANAGEMENT INFORMATION SYSTEM (HOTEL)." Afribary, 6 Jun. 2026, http://library.afribary.com/works/design-and-implementation-of-computerized-front-management-information-system-hotel. Accessed June 15, 2026.
Chicago
Research, Afri. "DESIGN AND IMPLEMENTATION OF COMPUTERIZED FRONT MANAGEMENT INFORMATION SYSTEM (HOTEL)." Afribary (2026). Accessed June 15, 2026. http://library.afribary.com/works/design-and-implementation-of-computerized-front-management-information-system-hotel