CONSTRUCTION OF AUTOMATIC CHANGE OVER WITH GENERATOR TRIP OFF

Authors: Afri Research | Engineering Electrical Electronics Engineering Research 34 pages 3,935 words

Subscribe to read and download this work.

ABSTRACT  As technological advancement has been on the increase in our society many have fallen in love with technology and world want to have a feel in virtually  to every thing they do. A design has been made in combination of electrical and electronics to change over from one power sources to the other automatically and trip off generation after 40 seconds without going through the point for manual operation. This project writing were organized in according way for easy understanding     TABLE OF CONTENT Title page Approval page Acknowledgement Abstract Table of content  Table of figure 
CHAPTER ONE   1.0Introduction 1.1Design objectives  1.2Significance of the project  1.3 The project report  models relevant to the design  
CHAPTER TWO     2.0Literature review  2.1System component analysis 2.2Theories and models relevant to the design 
CHAPTER THREE     3.0System design  3.1Description of the system building blocks  3.2System specification and block diagram 3.3Description of overall operation of the system  3.4Complete circuit diagram of the system 
CHAPTER FOUR   4.0Implementation testing and results  4.1Packaging of the system 
CHAPTER FIVE   5.0Cost analysis  5.1Conclusions and recommendation/suggestion For Further Implementation References 

Share this work